Client

Repsol YPF

Objective

To determine which of the three selected semi-submersible platforms have a better seakeeping in drilling operation EAST-1, 49.0 m of water depth, CALYPSO 2002 Project

  • PACESETTER ENHACED, ACTINIA platform (TRANSOCEAN)
  • AKER H3 ENHACED, BREDFORD DOLPHIN platform (DOLPHIN)
  • MD602, STENA DEE platform (STENA )

Scope

  • Mooring system analysis
  • Riser analysis
  • Mooring analysis and results
  • Maximum admissible tension