Client

MetalShips and Docks

Objective

Research on a new installation unit for offshore wind farms

Scope

Responsible or involved in the following workpackages:

  • PT 2.1: Definition of the demanded requirements by the sector. (Participant)
  • PT 2.2: Generation of the alternative, comparative analysis and selection of the optimum alternative. (Participant)
  • PT 3.1: Development of a conceptual technical specification. (Head)
  • PT 3.2: Development of a conceptual design to preliminary draft level. (Head)
  • PT 4.1: Development of exploitation models. (Participant)
  • PT 4.2: Development of exploitation economic scenarios. (Participant)
  • PT 4.3: Development of a roadmap for deployment. (Participant)