TOWING & INSTALLATION
PROJECT: TANDEM TOWING OF PORTO DA CASA AND PORTO ARADE PONTOONS

PROJECT: SACYR I FLOATING DOCK. TOWING AND MOORING
- Basic and Detail Engineering
- Inspection during construction
- Technical assistance to the Owner Tech. office.
- Engineering for the Deck extension
- Towing and Mooring
- Length: 56.00 m
- Outer Beam: 36.00 m
- Inner Beam: 30.00 m
- Columns Depth: 15.90 m
- Maximum Draft: 13.90 m
PROJECT: PLOCAN TOWING AND INSTALLATION
- Mooring to pier
- Installation and towing stability
- Platform installation design and procedures
- Temporary mooring design

PROJECT: KUGIRA II FLOATING DOCK TOWING
PROJECT: CONDOMINE FLOATING DOCK
PROJECT: ALUMINIUM SHUTTLE FOR THE PRESTIGE OIL RECOVERY OPERATION