Project Description

PROJECT: Mar Argentino

  • Oceanographic and research vessel for Argentinian Goverment
  • Owner Representative Inspection during construction at Armón Shipyard (Vigo, Spain)
  • Sea Trials follow-up

PROJECT: Victor Angelescu

  • Oceanographic and research vessel for Argentinian Goverment
  • Owner Representative Inspection during construction at Armón Shipyard (Vigo, Spain)
  • Sea Trials follow-up

PROJECT: Sato Baleares Split Hopper

  • On-site inspection during transformation
  • Platform construction for crane installation
  • Bulkward installation

PROJECT: SACYR-1 Floating dock

  • Owner Representative Inspection after damage
  • Repair works follow up

PROJECT: KUGIRA II Floating dock

  • Owner Representative during construction in Setubal (Portugal)
  • Technical assistance to Owner Technical Office

PROJECT: FRP fishing fleet

  • Owner Inspection Representative during construction off 200 fishing vessel for Angola
  • Construction planning and follow-up
  • Material Control
  • Services Control
  • Trials planning and control
All projects