PROJECT: STAFFORSHIRE (eCSOV)
Concept design review
Hull shape and model test campaign follow up
Basic design and approval engineering
- LOA: 89.63 m
- LPP: 81.22 m
- B: 19.80 m
- D: 8.00 m
- T: 5.00 m
- POB: 120 p
- Speed: 13 knots
- BESS (Batteries): 25MW
- Endurance: 30 days
- Helideck; Walk2Work
- DPII

DNV+1A WINDFARM SERVICE, BATTERY POWER, E0, LFL FUELLED, DYNPOS(AUTR-CB), COMF(C-2, V-2), SPS, WALK2WORK, CLEAN (DESIGN, TIER III), CYBER SECURE (ESSENTIAL), LCS, BIS, STRENGTHENED(DK), SMART(EEN), BWM(T), ER(SCR), HELDK(SH), RECYCLABLE, SHORE POWER, NAUT (OSV)
PROJECT: SEA-1750 SOV
Concept design development
- LOA: 76.00 m
- LPP: 68.60 m
- B: 18.00 m
- D: 7.00 m
- T: 4.75 m
- Crew: 60 p
- Speed: 13 knots
- BESS (Batteries): 16MW
- Drone Flight Deck; WalktoWork
- DPII
PROJECT: SEA1528 ePROA
Extended Concept design
Hull shape and model test campaign
Life cycle and budget
- LOA: 89.63 m
- LPP: 81.22 m
- B: 19.80 m
- D: 8.00 m
- T: 5.00 m
- POB: 120 p
- Speed: 13 knots
- BESS (Batteries): 25MW
- Endurance: 30 days
- Helideck; Walk2Work
- DPII

PROJECT: ALBERT BETZ (DP-2 Offshore Wind Service Operation Vessel)
Accommodation Detail Engineering:
- 3D model in Foran
- Isometric drawings
- Workshop and fabrication drawings
- LOA: 58.50 m
- LPP: 49.80 m
- B: 16.60 m
- D: 7.00 m
- T: 5.50 m
- Accommodation: 42 p
- Speed: 12 knots
BV I + HULL + MACH, SPECIAL SERVICE-SERVICE OPERATION VESSEL, SDS, COMF-VIB, COMF-NOISE 3,UNRESTRICTED NAVIGATION, +AUT-UMS, +DYNAPOS-AM/AT R, INWATERSURVEY, HABITABILITY, SP42, PROTECTED FO TANK, GREEN PASSPORT




