PROJECT: ANTARTIC (Pelagic Trawler Vessel)
-Structural Prouduction Engineering:
- 3D model in Foran
- Cutting files
- Assembly and fabrication drawings
-Outfitting Production Engineering:
- 3D model in Foran
- Piping design
- Isometrics
- Minor foundations
- RSW piping support
- HVAC and Cable tray coordination
- Assembly drawings
- LOA: 69.60 m
- Bmax: 15.20 m
- D: 6.30 m
- Hold capacity: 2000 m3
- Crew: 14 POB

PROJECT: REGINA C (Artic Freezer Trawler)
-Structural Prouduction Engineering:
- 3D model in Foran
- Cutting files
- Assembly and fabrication drawings
-Outfitting Production Engineering:
- 3D model in Foran
- Piping design
- Isometrics
- Minor foundations
- RSW piping support
- HVAC and Cable tray coordination
- Assembly drawings
Shipyard operations support:
- Blocks lifting and erection calculations
- LOA: 79.05 m
- LPP: 70.80 m
- B: 17.00 m
- D: 7.55 m
- Crew: 32 p
PROJECT: Fishing fleet of Angola's Goverment
Angola Fishing Ministry Support to the fishing fleet construction of 200 vessels:
- Construction planning and follow-up
- Material Control
- Services Control
- Trials planning and control
- Fishing boats of 7.4 m and 13.80 m
- Long line vessels de 12 m and 25 m
- Purse seine vessel of 25 m
- Fishing support vessel of 16 m
- Long line catamaran of 18 m







