Project Description

TOWING & INSTALLATION

PROJECT: TANDEM TOWING OF PORTO DA CASA AND PORTO ARADE PONTOONS

TANDEM TOWING OF PORTO DA CASA AND PORTO ARADE PONTOONS

PROJECT: SACYR I FLOATING DOCK. TOWING AND MOORING

  • Basic and Detail Engineering
  • Inspection during construction
  • Technical assistance to the Owner Tech. office.
  • Engineering for the Deck extension
  • Towing and Mooring
  • Length: 56.00 m
  • Outer Beam: 36.00 m
  • Inner Beam: 30.00 m
  • Columns Depth: 15.90 m
  • Maximum Draft: 13.90 m

PROJECT: PLOCAN TOWING AND INSTALLATION

  • Mooring to pier
  • Installation and towing stability
  • Platform installation design and procedures
  • Temporary mooring design
PLOCAN TOWING AND INSTALLATION-1

PROJECT: KUGIRA II FLOATING DOCK TOWING

PROJECT: CONDOMINE FLOATING DOCK

PROJECT: ALUMINIUM SHUTTLE FOR THE PRESTIGE OIL RECOVERY OPERATION

All projects